Perris, CA
Flat and low-slope roofing in Perris
Flat sections on an otherwise pitched house are where the leaks are. Additions, porch roofs, and the bit over the garage.
Or call (951) 418-3407Describe the flat roofing job
Three questions, then the address. Up to three Perris contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Perris and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.
- Whether a coating is being sold as a repair
- Drain, scupper and overflow provision
- How the flat section is flashed into adjoining walls and pitched roofs
- Whether water ponds anywhere after rain
- Which membrane, and how the seams are joined
Ponding water is the enemy. Anything still sitting there forty-eight hours after rain is a design problem, and tapered insulation is usually the answer.
Drains and scuppers need to be checked every season. One blocked drain can hold enough water to matter structurally.
Modified bitumen is the rolled, torched or self-adhered system you see on older flat additions. Cheaper, and shorter-lived.
Locally
Close behind that: the autumn offshore winds, which find anything already loose. These winds are not constant, which is the problem. A roof gets nine quiet months and then one night at fifty miles an hour, and whatever was marginal goes.
About flat roofing here
What should I do to prepare?
Clear the driveway, protect attic storage from falling dust, and plan for two loud days. Agree in advance where the dumpster goes and who sweeps for nails.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Why three quotes and not one?
Because one price tells you nothing. Three tells you where the middle is, and the outliers are informative in both directions — the very cheapest is usually leaving something out, and the most expensive should be able to say what you are getting for it.
Start with a free estimate
It is free, and nothing obliges you to hire anyone.
