Perris, CA
Flat and low-slope roofing in Perris
Flat sections on an otherwise pitched house are where the leaks are. Additions, porch roofs, and the bit over the garage.
Describe the flat roofing job
Three questions, then the address. Up to three Perris contractors who do this work.
You are on the list.
No provider in Perris is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.
- Whether a coating is being sold as a repair
- Drain, scupper and overflow provision
- How the flat section is flashed into adjoining walls and pitched roofs
- Whether water ponds anywhere after rain
- Which membrane, and how the seams are joined
Ponding water is the enemy. Anything still sitting there forty-eight hours after rain is a design problem, and tapered insulation is usually the answer.
Drains and scuppers need to be checked every season. One blocked drain can hold enough water to matter structurally.
Modified bitumen is the rolled, torched or self-adhered system you see on older flat additions. Cheaper, and shorter-lived.
Locally
Close behind that: the autumn offshore winds, which find anything already loose. These winds are not constant, which is the problem. A roof gets nine quiet months and then one night at fifty miles an hour, and whatever was marginal goes.
About flat roofing here
What should I do to prepare?
Clear the driveway, protect attic storage from falling dust, and plan for two loud days. Agree in advance where the dumpster goes and who sweeps for nails.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Why three quotes and not one?
Because one price tells you nothing. Three tells you where the middle is, and the outliers are informative in both directions — the very cheapest is usually leaving something out, and the most expensive should be able to say what you are getting for it.
Start with a free estimate
No cost. We email you once when a provider near you can take it on.
